We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Misclassifying a crack is the single most common mistake in this trade — treating a structural crack with the wrong material, or injecting a crack that actually needed a broader drainage fix behind it. We classify before we inject, every time.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Montrose, NY job.
Most crack injection appointments can be scheduled within a day or two of your call.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Selling a Montrose, NY home with a flagged foundation crack? We can inspect, repair, and provide documentation for the buyer's lender or inspector.

Photos texted ahead of time help us prep for the visit and sometimes speed up scheduling.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
We explain why we're recommending one material over the other so the choice isn't a black box.
We check the injection ports after curing to confirm the material fully filled the crack before we consider the job done.

"Crack in our basement wall had been leaking for a year before we finally called. Injection took less than an afternoon and it's been dry since."
— Montrose Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Montrose Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Montrose Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Montrose Homeowner
Crack classification is separate from water contamination — we assess whether the crack is structural or cosmetic based on width, pattern, and any wall bowing.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
We make the call on-site after inspecting the crack, not before we've seen it.
Most single-crack injections are completed in a few hours during one visit.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Yes — we provide before-and-after photos and a repair summary that Montrose, NY buyers, sellers, and lenders commonly request.
Selling a Montrose property on a tight timeline? Call +1-866-476-1348 and we'll prioritize scheduling around your closing date.



Zip codes we serve in Montrose, NY: 10548
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.